
Always adhere to your machine manufacturer's warm up recommendations for your machine, normally a brief daily routine. Excellent information on spindle break-in for new and repaired/rebuilt spindles at spindle.info/answers

Always adhere to your machine manufacturer's warm up recommendations for your machine, normally a brief daily routine. Excellent information on spindle break-in for new and repaired/rebuilt spindles at spindle.info/answers

On Maintenance & Manufacturing Insights, I talk with Jim Starker — Corporate Senior Asset Reliability Manager at Novolex — about why roughly 62% of OEM PM tasks don't tie to a real failure, how to rank your most critical assets, owning downtime once the work order starts, and winning back wrench time across 100-plus plants.
Read →
On Maintenance & Manufacturing Insights, I talk with Boe Due — general manager of Bitec SMI, an aerospace CNC shop in Dayton, Ohio — about moving small and mid-sized shops from reactive to preventive maintenance, why most shops have no real PM program, and putting the right expert in the right seat.
Read →
On Maintenance & Manufacturing Insights, I talk with David Craig — founder and CEO of Prodigy IQ Technologies and a 20-year manufacturing veteran — about why most plants don't have a detection problem, they have a handoff problem, how an 18-hour shift led to 4,000 defective parts, and why AI is a multiplier, not a magic fix.
Read →