Skip to content
Centerline Inc. logoCENTERLINE.
Centerlinespindle-repair1 min read

How Did They Film Predator Up There?

On a family trip to Puerto Vallarta, Martin Engster visited the jungle where The Predator was filmed — and couldn't stop thinking like a machine guy about the logistics of getting the gear up there in the 1980s.

How Did They Film Predator Up There?

My family and I went to Puerto Vallarta. We got to see the place where they filmed The Predator with Arnold Schwarzenegger. I'm an '80s kid — I grew up on that movie.

The ride up was more than half an hour on a rough dirt road in the back of a truck.

The whole time I was thinking like a machine guy: how did they get all that camera gear up there in the '80s? Back then it was mostly jungle and rocks. The logistics alone are mind-blowing.

Watch & Listen

Related articles

Be a Doctor, Not a Mortician: My Conversation with Boe Due
vlog

Be a Doctor, Not a Mortician: My Conversation with Boe Due

On Maintenance & Manufacturing Insights, I talk with Boe Due — general manager of Bitec SMI, an aerospace CNC shop in Dayton, Ohio — about moving small and mid-sized shops from reactive to preventive maintenance, why most shops have no real PM program, and putting the right expert in the right seat.

Read →
Who Owns the Problem? My Conversation with David Craig
vlog

Who Owns the Problem? My Conversation with David Craig

On Maintenance & Manufacturing Insights, I talk with David Craig — founder and CEO of Prodigy IQ Technologies and a 20-year manufacturing veteran — about why most plants don't have a detection problem, they have a handoff problem, how an 18-hour shift led to 4,000 defective parts, and why AI is a multiplier, not a magic fix.

Read →
The Power of Planning Ahead: My Conversation with Richard Horn
vlog

The Power of Planning Ahead: My Conversation with Richard Horn

On Maintenance & Manufacturing Insights, I talk with Richard Horn, a production supervisor at Ford Motor Company, about keeping high-volume automotive lines running — how producing 1,200 extra parts one day bought his team a day and a half when a stamping die broke, why cleanliness speeds up troubleshooting, and the growing shortage of skilled tradespeople.

Read →